Welcome to our first floor bathroom, aka the "Prison bathroom". After coming home from a kayaking trip and having the floor sink in, we decided it was time to do some digging and fixing.
After delaying for as long as I could, it was time to tear into the floor
At this point, I discovered that the floor joist under the worst part was halfway rotten through. It needed to be replace, which means taking a trip into the very cramped crawl space to replace it.
The next few steps took far too long, and I seem to have forgotten to take pictures of most of it... Tiles on the floor were added and grouted, the gaps in the corners were filled and sanded. Walls and ceiling was primed, and then painted. Caulk was also applied everywhere, including copious amounts on my hands...
All done!
I'm not an expert, this isn't instruction. Don't do what I do. kthx